Upcoming (30 days)
Intervention Equipment Type Priority Scheduled Technician Status
Critical Vibration Investigation
↳ Threshold breach: vibration 8.9 mm/s
Compressor Station #3
red
corrective critical May 18, 02:24 AM Sarah Okonkwo scheduled View
Quarterly Cooling Tower Maintenance
↳ Scheduled maintenance
Cooling Tower Unit B
yellow
preventive medium May 20, 10:24 PM Dmitri Volkov scheduled View
Pump Seal Replacement
↳ Predictive: seal wear detected
Pump Assembly P-07
yellow
preventive medium May 24, 10:24 PM Marcus Chen scheduled View
Annual Turbine Generator Overhaul
↳ Annual schedule
Main Turbine Generator #1
green
preventive high May 31, 10:24 PM Sarah Okonkwo scheduled View
Emergency Generator Load Test
↳ Monthly schedule
Emergency Diesel Generator
green
inspection low Jun 7, 10:24 PM Priya Sharma scheduled View